FabriSteel Fasten it Drive it

graphic Overview
graphic CP Pierceform Studs
graphic CS Pierceform Studs
graphic Hi-Stress Pierce Nuts
graphic Universal Pierce Nuts
graphic MHN PierceNuts
graphic RSK PierceForm Nuts
graphic RSK PierceForm Nuts
 
 
Pierce Nut Standards  |  Part Design Guidelines  |  MultiPierce Reel-Feed Design Info 
Multimatic Reel-Feed Design Info  |  MultiPierce Bulk-Feed Design Info 
Multimatic Bulk-Feed Design Info  |  Die Buttons and Retainers  |  Maintenance  |  Optional Tooling
Tooling Standards  |  Troubleshooting  |  Tooling Set-Up and Alignment Procedures  

Tooling Set-Up and Alignment Procedures

Multipierce and Multimatic Heads may be mounted in the die by either of two methods:  Direct Layout or Die Layout.

Direct Layout Method

  • Install die button retainer by direct layout or with template.
  • Insert alignment die button in retainer.
  • Invert die set (so die button retainer is on top).
  • Set base, back-up plate, and plunger in head position.
  • Lower die shoe (with retainer) so plunger enters die button.

Plunger and die button must be equivalent sizes.

  • Transfer base mounting holes to die (with punch).
  • Repeat steps above for all Heads in die.
  • Drill and tap mounting holes for screws.
  • Loosely mount base and back-up plate in each Head location.
  • Replace mating die shoe.
  • Lower die shoe (with retainer) so plunger enters die button
  • Tighten base mounting screws.
  • Repeat steps above for each Head in die.
  • Remove mating die shoe; transfer dowel holes.  Drill as required for reaming.
  • Ream for press fit for dowel pins.
  • Locate and machine clearance holes for shank and spring.
  • Install Head in each Head location.  Follow plant die tryout procedures; follow Multifastener ram setting procedures in this manual.

Die Layout Method

  • Install die button retainer by direct layout or with template.  Insert alignment die button in retainer.
  • Loosely mount base, back-up plate, and plunger in each Head location by die layout procedure.
  • Lower die shoe with retainer so plunger properly enters die button.
  • Tighten base mounting screws.
  • Repeat steps above for each Head in die.
  • Remove mating die shoe; transfer dowel holes.  Drill as required for reaming.
  • Ream for press fit for dowel pins.
  • Locate and machine clearance holes for shank and spring.
  • Install Head in each Head location.  Follow plant die tryout procedures; follow ram setting procedures in this manual.

 

 

Home  |  Site Map  |  Search

FabriSteel A Division of Whitesell International Corporation
22100 Trolley Industrial Drive
Taylor, MI  48180-1872
(313) 299-8540

 

This page last modified 06/08/07 .
All information © 2007 Whitesell International Corporation

Site Use Policy

Go To Top