Tooling Set-Up and Alignment Procedures
Good
and Not Good Registry Markers
Function
- The Registry Marker has a raised circle with the letters "N
" and "G " located within, raised to different levels (see
Fig.2).
- At the bottom of the die stroke, if a circle and a "G " are
stamped in your metal panel, the die is set properly (see
Fig.1).
- If a circle and "NG " appears, the hit is too hard (see
Fig.1).
- If no mark appears, the hit is too light (see Fig.1).
Location in the Die
The Registry Marker is mounted in the same die shoe as the
installation head and is positioned over the part panel that is to
receive the PierceForm Nut (see Fig.3).The Registry Marker should be
located as close to the Head as possible.
Setting
The proper shut height of the "Good " Registry Marker is 76.07mm
(2.995")(see Fig 3).Shut height dimension does not include retainer
plate thickness.
Mounting in the Die
The Registry Marker incorporates a heavy-duty ball lock feature
to facilitate mounting in the die.(Ball lock retainer must be
provided by customer.)
Additional Information
Inch Registry Markers are available. Heavy-duty ball lock
Registry Markers also available: Inch MS-26-30-H, Metric
MSM-26-30-HD
Alignment
Procedures
MHN Round Pierce Nut installation heads may be mounted in the die
by either of two methods: Direct Layout or Die Layout.
Direct Layout Method
- Install die button retainer by direct layout or with
template.
- Insert alignment die button in retainer.
- Invert die set (so die button retainer is on top).
- Set base, back-up plate, and plunger in head position.
- Lower die shoe (with retainer) so plunger enters die button.
Plunger and die button must be equivalent sizes.
- Transfer base mounting holes to die (with punch).
- Repeat steps above for all heads in die.
- Drill and tap mounting holes for screws.
- Loosely mount base and back-up plate in each head location.
- Replace mating die shoe.
- Lower die shoe (with retainer) so plunger enters die button.
- Tighten base mounting screws.
- Repeat steps above for each head in die.
- Remove mating die shoe; transfer dowel holes. Drill as
required for reaming.
- Ream for press fit for dowel pins.
- Locate and machine clearance holes for shank and spring.
- Install head in each head location. Follow plant die tryout
procedures; follow Multifastener ram setting procedures in this
manual.
Die Layout Method
- Install die button retainer by direct layout or with
template.
- Insert alignment die button in retainer.
- Loosely mount base, back-up plate, and plunger in each head
location by die layout procedure.
- Lower die shoe with retainer so plunger properly enters die
button.
- Tighten base mounting screws.
- Repeat steps above for each head in die.
- Remove mating die shoe; transfer dowel holes. Drill as
required for reaming.
- Ream for press fit for dowel pins.
- Locate and machine clearance holes for shank and spring.
- Install head in each head location. Follow plant die tryout
procedures; follow ram setting procedures in this manual.
|