PierceForm Installation System
System Controller
This unit controls all functions of the system. The timing
of all solenoid valves, the release of a Stud to the Installation
Head, and the sensing of a Stud within the Head are all sequenced
through this Controller. All functions are timed to take place
within single or continuous cycles. Note: If the speed
of the press is to be altered, the controller may need to be
reprogrammed.
Pneumatic Control Valve
This system consists of a Solenoid, which controls the movement
of the Installation Head. The Solenoid is initiated through
the system controller. This timing shall be pre-set and
adjusted to the stroke and speed of your press.
Installation Head
The PierceForm Stud Installation Head is mounted in the upper die
shoe of the press. It is air-controlled and designed to
accurately install PierceForm Studs using the mechanical force of
the press.
Stud Guide
The plastic Stud Guide is connected between the Feeder and the
Installation Head. When setting up the system, careful
attention must be taken not to kink this component. Generally
a three foot radius is used to ensure efficient operation. The
length of the Stud Guide effects cycle time.
Feeder
Because PierceForm Studs are blown by air pressure from the
feeder to the Installation Head in the Feed System, the Feeder can
be mounted at any level you choose. The Feeder has internal
solenoids integrated with the System Controller for blowing of Studs
to the Head Assembly.
Die Button and Retainer
The Die Button is secured in a Retainer, which is mounted in the
lower die shoe. When the press closes, the Installation Head
punches the PierceForm Stud through the metal panel supported by the
Die Button. The Die Button forms the barrel of the Stud around
its circumference to securely lock it in place and coins the slug
into the barrel, thereby eliminating scrap disposal.

|